Project: Uhl - III, Himachal Pradesh (In Progress)

Client: Beas Valley Power Corporation Limited (Promoted by HPSEB Ltd)

Capacity: 100 MW

Civil Works: Headrace Tunnel 4.15m, Modified Horse-shoe shaped 1358m long excavation & 8010m long Concrete Lining.

Project: Knyshi - I, Meghalaya (In Progress)

Client: Energy Infratech Private Limited

Capacity: 270 MW

Infra Works: Survey and Investigation Services &Basic infrastructure Development

                   (Roads/Culverts/Bridges/Pathways/Temporary Colony)

Civil Works: Exploratory tunnel of size 3.5m x 3.0mat the Power House and of size 2.5m x 2.2mat the Dam Site

Project: Emra - II, Arunachal Pradesh (In Progress)

Client: Athena Emra Power Private Limited 

Capacity: 390MW

Infra Works: Survey and Investigation Services & Basic infrastructure Development (Roads / Bridges / Exploratory tunnels)

Project: Nalo, Arunachal Pradesh (In Progress)

Client: Indus Hydro Power Private Limited

Capacity: 4 x 90 MW

Infra Works: Survey and Investigation Services & Works and Services

                   (Roads, Bridges, Pathways, Exploratory tunnels of size 2.2m x 2.0m)

Project: Yamne - I, Arunachal Pradesh (In Progress)

Client: Aquagreen Engineering Management Private Limited

Capacity: 3 x 45 MW

Infra Works: Survey and Investigation Services & Works and Services

Project: Yamne - II, Arunachal Pradesh (In Progress)

Client: SS Yame Energy Venture Private Limited 

Capacity: 3 x 30 MW

Infra Works: Survey and Investigation Services & Works and Services

Project: Anjaw Arunachal Pradesh (In Progress)

Client: Lohit Urja Private Limited

Capacity: 7 x 38.57 MW

Infra Works: Survey and Investigation Services & Works and Services

Project: Demwe Upper Arunachal Pradesh (In Progress)

Client: Lohit Urja Private Limited

Capacity: 4 x 250 MW

Infra Works: Survey and Investigation Services & Works and Services