Capacity |
5 x 342 MW + 1 x 40 MW |
|
Design |
Complete Planning, Design & Engineering |
|
Contract Value |
INR 4507.38 Crores (US$ 694.14 Millions) (1 US$=INR 65) |
|
Project Status |
Work in progress |
|
Civil Works |
Diversion Tunnels |
14.0m, Horse-shoe shaped, 5 Nos. Each of 1 km long |
Diversion Tunnels |
6.0m, Horse-shoe shaped, 1 No. |
|
Power Intake |
5 Nos. rectangular fore bay type (125m long and 37.70m high) |
|
Underground Pressure Shaft |
10m diameter, 5 Nos. (Average length 602m) |
|
Tailrace Tunnel |
13.0m, Horse-shoe shaped, 4 Nos. |
|
Surface Power House |
200.57m (L)x28m (W) x 50m (H) |
|
Infra Works |
Roads |
19 Km |
Residential Buildings |
27533 Sq.m. |
|
Office Buildings |
4000 Sq.m. |
|
Non-residential buildings |
33950 Sq.m. |
|
EM Works |
Design, manufacture, supply, transportation, storage, erection, testing and commissioning of electro-mechanical plant and machinery (5 nos. Of 342MW & 1 no of 40MW Francis Type Turbines), main power transformers, switchyard and power grid interconnection facilities. |
|
HM Works |
Design, manufacture, supply, transportation, storage, erection, testing and commissioning of electro-mechanical plant and machinery (For each 14m dia. diversion tunnels 2 fixed wheel gates of size 5.85m x 14m at inlet, for 6m dia. diversion tunnel 1 fixed wheel gate of size 6m x 6m, 12 Nos. of spillway radial gates for each of sluice spillway bays of 8.6m x 11m, 1 No. of spillway radial gate for the surface spillway bay of 12.5m x 18m) |
Note: EM – Electro mechanical and HM - Hydro-mechanical