Abir’s expertise is in Design, Manufacturing, Fabrication, Assembling, Testing at Workshop, Supply to Site, Storage and handling of all transmission line materials, Walk-over & detail Survey, Soil Investigation, Construction of Foundation, Erection of Towers, Stringing the Conductors, Testing and commissioning of Single/ Double Circuit Transmission Line ranging from 33 KV to 400 KV.
Project: Patikari, Himachal Pradesh (Completed)
Client: Patikari Power Private Limited
Capacity
|
33 KV Double Circuit Transmission Line
|
Transmission Line Works
|
Design, Manufacture, Supply, Erection and Commissioning of 33 KVTransmission Line 16 KM Long including 33 KV Sub-station from Patikari Hydro Electric Project to Pandoh Sub-station, Himachal Pradesh, India.
|
Project: Sainj, Himachal Pradesh (Completed)
Client: Himshakthi Projects Pvt Limited
Capacity
|
33 KV Single Circuit Transmission Line
|
Transmission Line Works
|
Design, Manufacture, Supply, Erection and Commissioning of 33 KVTransmission Line 20 KM Long including 33/11 KV Sub-station from Sainj Hydro Electric Project to Shillai Sub-station, Himachal Pradesh, India.
|
Project: Malana II, Himachal Pradesh (Completed)
Client: Everest Power Private Limited
Capacity
|
132 KV Transmission Line
|
Transmission Line Works
|
Design, Manufacture, Supply, Erection and Commissioning of Transmission Line 18 KM Long including 132/220KV Sub-station from Malan-II HEP to interconnection point at Nalagarh, Himachal Pradesh, India.
|
Project: TPTL, Sikkim (in Progress)
Client: Teesta Valley Power Transmission Limited
Capacity
|
400 KV Double Circuit Transmission Line
|
Transmission Line Works
|
Design, Manufacture, Supply, Erection and Commissioning Transmission Line 205 KM Long from Teesta-III HEP to Panighata (near Siliguri) and from Panighata to Kishanganj in the states of Sikkim and West Bengal, India.
|